Adani Cement is upgrading its facility in Himachal Pradesh by installing a new 7800t/day double-stage cooler grate. This upgrade aims to increase efficiency, lower power consumption and clinker temperature and enhance waste heat recovery system performance, according to the company. The project involves replacing the first and second grates of the existing IKN pendulum cooler.