Skip to content Skip to footer

Hoffmann Green Cement Technologies commissions H2 clinker-free cement plant

Hoffmann Green Cement Technologies has commissioned its H2 plant, a 1000t/day clinker-free cement plant, adjacent to its existing H1 clinker-free cement plant in Bournezeau, Pays de la Loire. L’Usine Nouvelle News has reported that the new plant took 24 months to build and cost Euro22m. The main part of the plant consists of a 70m tower, where activated clay, ground granulated blast furnace slag (GGBFS) and gypsum are mixed to produce the cement. It is installed with solar panels capable of supplying 50% of its energy consumption. The producer says that its clinker-free cement has over 90% lower CO2 emissions than cement produced with ordinary Portland cement (OPC). It aims to sell 24,000t of the product throughout 2023.