France-based Fives has won a contract to build a 50t/day clay calcination unit at Rohrdorfer’s Rohrdorf cement plant in Bavaria. The unit will integrate into the plant’s clinker line in order to allow it to test the production of limestone calcined clay cement with up to 40% reduced CO2 emissions. Fives’ clay calcination unit uses a flash calcination process, based on a three-stage preheater, flash calciner and decolourisation system.
Rohrdorfer’s Net Zero Emissions Labs team is responsible for the project to decarbonise the Rohrdorf cement plant by 2038. Its managing director Helmut Leibinger said “After a detailed technical review, we decided that the flash calciner with an integrated clay calcination unit from Fives FCB was the best solution in terms of reliability, efficiency and colour control. We are confident that the unit will be essential in moving forward on our pathway to net zero.”